DC OpsCore LOTO links the equipment isolation record to the asset, work order, procedure, change and permit references. Customers can use DC SafeOps HSE integration or enter external PTW/RAMS references manually.
Use the platform as a standalone CMMS/HSE system or connect both products where your process requires it.
Select the site, asset, work order/PPM, current procedure and change record instead of relying only on manually typed references.
Document electrical, mechanical, hydraulic, pneumatic, thermal, gravity and other stored-energy sources and physical isolation points.
Record lock/tag requirements, identifiers, authorized persons and application details against the controlled isolation.
Require verification before controlled work proceeds and retain the method, verifier and system timestamp in the audit history.
Confirm work completion, people and tools clear, guards restored, authorization to remove isolation and return-to-service verification.
Use approved DC SafeOps PTW/RAMS when connected, or external/manual permit references when a customer uses another HSE system.
Start a free 30-day trial or request a tailored demonstration for your sites, assets, procedures and work-control process.